ZEUS SOLAR

Site management · Quality control · Full A electrical authorisation

Quality in every row – for megawatt-scale solar parks

Site management, quality control and electrical expertise for ground-mounted solar parks – from piling and racking to cable routing, transformer stations and commissioning. Experience from 101 MW in Sweden and projects in 11 EU countries.

0 MW

solar plant in Sweden as site manager (Wingfield + Gaslight)

0+ projects

solar projects in Sweden and the EU

0 countries

EU countries with project experience

0+ yrs

as site manager for solar parks

Experience from the field

Zeus Solar AB

Experience from the field

Zeus Solar AB manages and controls the construction of utility-scale ground-mounted solar parks. We are currently building solar parks for Primora Energy (formerly Svea Solar) in Sweden. Behind us are site management of a 101 MW solar plant for Solkompaniet and more than ten solar projects in Sweden and the EU – with a focus on safety, technical precision and on-time delivery.

Zeus Solar

Leadership

Oleh Sanda

Founder & CEO · Site Manager · Senior Electrical Specialist

Site manager with extensive experience in building utility-scale solar power plants across Europe. Specialised in site leadership, infrastructure engineering and high-voltage systems – with full A authorisation from Elsäkerhetsverket and a focus on safety, technical precision and delivery.

LanguagesEnglish, Polish, Ukrainian
Project experienceSweden, Poland, Germany, Netherlands, Croatia, Slovenia, Estonia, Lithuania, Latvia, Czech Republic, Denmark

Experience

  1. 2026 –Zeus Solar AB

    Founder, CEO & site manager – solar parks for Primora Energy

  2. 2025 – 2026Solkompaniet

    Site manager – 101 MW solar project in Sweden

  3. 2021 – 2024Remor Solar

    Site manager & head electrician – 10+ solar projects in Sweden and the EU

Authorisations & certificates

  • Full A-behörighet (Elsäkerhetsverket)
  • BAS-P & BAS-U
  • ESA 2 & EBR
  • AB 04 & ABT 06
  • TYA yrkesbevis – grävmaskin & hjullastare
  • HLR & första hjälpen / L-ABC

Services

Control at every stage of solar park construction

01

Site management

Management of the entire site: subcontractors, schedule, resources and daily follow-up – in line with Swedish technical standards and safety regulations.

02

Quality control & assurance

Inspection of piling, racking, modules and cabling against drawings and manufacturer requirements, with non-conformance management and punch lists.

03

Low & medium voltage

Connections to transformer stations and inverters, carried out and verified under full A authorisation from Elsäkerhetsverket.

04

Trenching & cable routing

Design of trenching layouts and cable routing strategies that save time and material on large ground-mounted sites.

05

Safety & contracts

BAS-P/BAS-U, ESA 2 and EBR in practice – and solid knowledge of the AB 04 and ABT 06 contract standards.

06

Commissioning & handover

Mechanical completion, grid compliance, final documentation and handover to the client.

Who we serve

Owners & investors

Owners & investors

Independent verification of what you pay for.

EPC contractors

EPC contractors

Extra QC capacity when the schedule is tight.

Utilities

Utilities

Confident handover ahead of grid connection.

O&M

O&M

Condition checks of operating parks.

Inspection plan

How we work

01

Documents

Review of drawings, inspection plan and manufacturer installation manuals.

02

Piling

Depth, inclination, position and pull-out tests – before racking starts.

03

Racking

Tolerances, torque, bolted connections and corrosion protection.

04

Modules & cabling

Handling, clamps, connectors, strings, cable routing and labelling.

05

Non-conformances

Punch lists with photo and location, followed up until every item is closed.

06

Handover

Mechanical completion, final report and documentation for the owner.

References

Solar parks we have quality-controlled

Solar parks for Primora Energy
SverigeStorskaligt2026 – pågår

Solar parks for Primora Energy

Zeus Solar AB manages the construction of utility-scale solar parks for Primora Energy (formerly Svea Solar): site management, subcontractor coordination and compliance with Swedish technical standards.

Wingfield solar park
Vingåker, Södermanland54 MW2025–2026

Wingfield solar park

Part of a 101 MW solar power project for Solkompaniet (now Alstra Energy). Site manager: on-site execution, subcontractors, quality assurance and safety.

Gaslight solar park
Götene, Västra Götaland47 MW2025–2026

Gaslight solar park

Part of a 101 MW solar power project for Solkompaniet (now Alstra Energy). Site manager: on-site execution, subcontractors, quality assurance and safety.

Solar projects in Sweden and the EU
11 EU-länder10+ projekt2021–2024

Solar projects in Sweden and the EU

Site manager and head electrician on more than ten solar projects: trenching layouts, cable routing and low/medium-voltage connections including transformer stations and inverters.

FAQ

What does a quality inspector do on a solar park?+

We verify that every stage – piling, racking, modules, cabling and groundworks – is carried out according to the documents and manufacturer requirements, document non-conformances and follow up until they are fixed.

Who hires you?+

Project owners, investors and their representatives who want independent control, as well as EPC contractors who need to reinforce their own quality organisation.

How do you report?+

Daily reports, weekly reports and punch lists with photo, GPS position and status. The format is adapted to the client's system.

Where do you work?+

Throughout Sweden and, when needed, in the rest of the Nordics.

Building a solar park?

Tell us about the project – size, location and schedule – and we will get back to you within 24 hours.

WhatsAppCall